Loading. Please wait.
0
Notifications
view all
My Profile
Log Out
Dashboard
Workforce Management
Workforce Master
Attendance
Attendance View
Mismatch Attendance(Rectification)
Attendance Extraction 5.0
Attendance Time Slot View
Late Comers Report For Staff
Late Comers Report For WorkMan
Key Activities
Job Vs Machine Config
Job Vs Vendor Config
Leave Registration
Holiday
Reports
Attendance on Date
Attendance on Month
Jobwise Monthly Report
Jobwise Monthly Report (shift Breakup)
SCwise Monthly Report
Location wise Report
Dept. Workmen Approved Vs Actual
WAS Reports
InTime Reports
WorkmenInTime Reports
LocationWiseDateRange Reports
WorkMen Attendance (Monthly) Report
Timewatch Deviation Report
Repair Report
Gate Pass
Gate Pass Import
Gate Pass Expiry Report
DLR
DLR (Summary & Location)
DLR Breakup
DLR View
DLR Monthly Report
Face App
Employee Registration
Attendance View
Employee Master
Home
Manage Attendance
Manage ATtendance
Export
Jobcode
Select...
HBBG3616 - Vizag Vessel II
LE080378 - Vizag Vessel
LE090217 - PUNATSANGCHHU HEP - DAM
LE110451 - RAPP 8
LE150286 - Barapullah Bridge,Delhi
LE150573 - WDFCC 15A
LE150574 - WDFCC 15C
LE150575 - WDFCC 15B
LE150642 - Vizag Vessel IV
LE160043 - FRFCF-WMP AND ALLIED STRUCTURES
LE160089 - WDFCC 15A-IHI
LE160090 - WDFCC 15C - IHI
LE160551 - Medigada
LE160593 - Mumbai Metro L&T
LE160594 - MMRC UGC07 - LNT REIMBURSEMENT IN LNT-STEC JV
LE160747 - BEL 3 - PortBlair
LE160748 - BEL 2 - Shillong
LE160749 - BEL 1 - Ambala
LE170085 - MEGA PKG2
LE170213 - KKNPP-3/4 Main
LE170216 - KKNPP-HTS Phase 2
LE170663 - FRFCF-FRP AND ALLIED STRUCTURES
LE171010 - VIH-PH
LE171094 - MTHL-3
LE171107 - MTHL_PKG1
LE180255 - TFL-Construction Child Job
LE180425 - Cochin Dry Dock
LE180738 - Vizag Vessel
LE180899 - Thane Creek Bridge - III
LE180986 - MCRP Pkg-4
LE181018 - MCRP Pkg-1
LE181293 - MCRP Pkg-1 (Ports)
LE190137 - MCRP Pkg-1 (Bridges)
LE190207 - RT02-METRO BGLR
LE190208 - RT03-METRO BGLR
LE191117 - RVNL-PKG-2
LE200137 - Breakwater at Dabhol
LE200288 - RRTS-P3L1
LE200289 - RRTS-P3L2
LE200466 - SITAMMA SAGAR
LE200586 - PAKAL DULAH
LE200685 - Lower Kopili HEP
LE200893 - Seabird Package MWC04
LE20M031 - MAHSR C4
LE20M049 - RRTS-PKG-07
LE21D028 - TWCC Factory Kanchipuram
LE21M073 - RVNL-PKG4
LE21M123 - KKNPP 5&6 MAIN PLANT
LE21M448 - CMRL PH 2 ECV-01
LE21M494 - CMRL PH 2 TU-02
LE21M539 - VSB BARC Tarapur
LE21M540 - CB BARC Tarapur
LE21M824 - KKNP SFSF
LE21M880 - MAHSR C4-Section 1
LE21M881 - MAHSR C4-Section 2
LE21M882 - MAHSR C4-Section 3
LE21M883 - MAHSR C4-Section 4
LE21M884 - MAHSR C4-Section 5
LE21M992 - CMRL CP10 EV03
LE21M993 - CMRL C5 ECV02
LE21MAF5 - PATNA UG METRO PC03
LE22M045 - MAHSR C5(Child Job)
LE22M200 - DMRC DC09
LE22M451 - CMRL ELEVATED RT01
LE22M633 - RAPP NDCT
LE22M914 - Gandhi Sagar - 1680 MW Hydro-Electric Pumped Storage Project
LE23M073 - Lakhwar multipurpose
LE23M144 - Dibang Lot-2 Project
LE23M613 - MAHSR C3 SEC-2
LE23M620 - Kolkata Metro UG1
LE23M803 - Orange Gate UG
LE23MA18 - Patna PC 08R
MM160004 - MML3 - UGC01
MM160006 - MML3 - UGC07
To Date
WAS Daily Input Page
07/06/2026
06/06/2026
05/06/2026
04/06/2026
Day
Night
Total
Day
Night
Total
Day
Night
Total
Day
Night
Total
Total Workmen
Dept. Workmen
Dept. Workmen (RSW)
P&M RSW
SC Workmen
Hired P&M SC
SubCont Workmen (PRW)
Security
B2B
DRL
Close
Loading...